Bulletin: I-15 – Dixie Drive and Cedar Canyon weekly construction forecast

UDOT

SOUTHERN UTAH-  Utah Department of Transportion has scheduled the following construction related activity In Washington and Iron Counties this week, Mar. 12-18.

St. George – in the area of and near Interstate Highway 15, Mileposts 5 and 6:

Activity:

* Paving.

* Barrier Installation.

* Sealing joints.

* Painting structures.

* Installing lighting.

* Drilling overhead sign shafts.

Impact:

* Intermittent lane closures on southbound I-15.

* Bluff Street interchange traffic merges into the I-15 work zone.

* I-15 Southbound traffic crosses median to the east side of corridor.

* I-15 speed is reduced to 55 m.p.h.

* No westbound traffic from Indian Hills onto Dixie Drive.

* Business access only between Indian Hills and Black Ridge on Hilton.

* The Hilton Drive Trail is closed.

For more information on this and similar topics visit these links:

UDOT’s I-15 Dixie Drive Interchange project website.

UDOT’s proposed Bluff Street project.

Public meeting on Bluff Street project brings out opposition.

Proposed Bluff Street project – what property owners can expect

Cedar Canyon. – on state Route 14, in the area of Mileposts 7-18.

Activity:

* Mobilizing equipment.

* Staging work area.

* Beginning excavation.

Impact:

* SR-14 is closed from Milepost 5 to Deer Valley.

* Access Duck Creek via state Route 143 and Mammoth Creek Road or via U.S. Route 89 to SR-14.

For more information on this and similar topics visit these links:

UDOT’s SR-14 landslide repair website

Landlide closes SR=-14 east of Cedar City

UDOT to design new roadway after landslide closes SR-14 for months

 

 

email: [email protected]

twitter: @STGnews

Copyright 2012 St. George News.

 

Free News Delivery by Email

Would you like to have the day's news stories delivered right to your inbox every evening? Enter your email below to start!

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.