Washington County
I-15, Black Ridge to the Iron County Line
Contract: W.W. Clyde & Co.
Amount: $17,338,995
Location: Between the Toquerville and New Harmony exits.
Impact: * Single lane closures both directions at the New Harmony Exit after Memorial Day.
* Lane shifts to accommodate paving and grading.
Activity: * Paving southbound lanes from mileposts 34 to 42
* Bridge deck repairs at Exit 42.
* Excavation and ramp work near Exit 36.
* Sub-grade work on the northbound outside lane.
I-15, Dixie Drive Interchange
Contract: Washington County Constructors
Amount: $52,549,452
Location: St. George (Mileposts 5 – 6)
Impact: * Two lanes of traffic remain open in both directions.
* All exits are open.
* Speed is reduced to 55 m.p.h.
* Northbound traffic has been shifted to the southbound side of the interstate near the Santa Clara bridge.
* Traffic lanes have been shifted on Hilton Drive.
* The Hilton Drive Trail is closed.
Activity: * Paving.
* Retention walls west of I-15.
* Structural preparation for the future southbound on-ramp.
* Hilton Drive box culvert concrete work.
* Flood debris removal and dredging.
* Electrical line work.
http://www.udot.utah.gov/i15dixie/
S.R. 212, Telegraph Street
Contract: Interstate Rock Products
Amount: $5,515,140
Location: City of Washington, 500 West to 300 East
Impact: * Beginning at 8 p.m. nightly lane restrictions from 300 W to Green Springs Drive.
* Beginning at 8 p.m. nightly lane restrictions from Telegraph to Middleton Drive.
* Temporary intersection alteration and flagging operations.
* Traffic lanes weave through the project.
* Reduced speeds.
* One lane of traffic in each direction.
* Sidewalk closures.
Activity: * Sealing the road underneath the I-15 Exit 10 overpass.
* Resurfacing the road at the Green Springs – Telegraph Intersection.
* Storm drain installation.
* Road widening.
* Retaining wall installation near 400 West.
* Utility work and landscaping.
S.R. 59, Arizona State Line to Apple Valley
Contract: A-T Asphalt Paving
Amount: $1,998,101
Location: Mileposts 0 to 11
Impact: * Oversized loads restricted.
* Pilot car operations with delays of up to 15 minutes.
Activity: Setting up traffic control and project equipment.
S.R. 9, 300 West To 800 North Hurricane
Contract: Interstate Rock Products
Amount: $10,203,871
Location: Hurricane City State Street
Impact: Expect single lane closures.
Activity: * Manhole work.
Southern Parkway Advanced Traffic Management
Contract: Transcore ITS
Amount: $370,674
Location: S.R. 7 Mileposts 0 to 7
Impact: No traffic impacts.
Activity: Fiber optic installation, junction boxes, camera foundations.